Uferpromenade mit historischen und modernen Gebäuden an einem ruhigen Gewässer, beleuchtet vom warmen Licht der Abendsonne, mit Hügeln im Hintergrund und weit ausgebreitetem Himmel.Uferpromenade mit historischen und modernen Gebäuden an einem ruhigen Gewässer, beleuchtet vom warmen Licht der Abendsonne, mit Hügeln im Hintergrund und weit ausgebreitetem Himmel.

Improving the Turkish Water Infrastructure

As part of a multi-year project, CDM Smith developed master plans and feasibility studies for water and wastewater systems – including planning, funding applications, and conceptual designs.

Client

Ministry of Environment and Urban Development | Central Anatolia and the Black Sea region, Turkey

Location

Turkey

Connect with an expert

Person in a black suit jacket and light blue shirt stands indoors.
Eric Kalmbach
Division Manager

7 Municipalities - 7 Master Plans

Seven master plans and seven feasibility studies for the water supply and wastewater system in seven Turkish municipalities form only part of a joint development project that CDM Smith has taken on. 

EU Water Management Program

As part of an EU-funded environmental program, we supported the improvement of water and wastewater infrastructure in Turkey.

Integrated Planning for Municipalities

For several Turkish municipalities, we developed water and wastewater master plans, followed by feasibility studies based on them.

Improving the water management cycle is one of several targets in the operative envi­ron­men­tal programme promoting regional development in Turkey. The European Union has provided the funds from the EU Instrument for Pre-Accession Assistance for the programme. The fund supports economic and social development in potential EU membership candidates while raising infra­struc­ture quality to the EU standards in the respective country.

As part of this programme, the aim was to optimise the water supply and wastewater system in seven municipalities in Central Anatolia and the Black Sea region. During the five-year project period, we first developed seven water and wastewater master plans and then prepared seven feasibility studies based on them. In addition to technical and financial aspects, we also considered environmental, legal, and socio-economic factors. On this basis, we prepared the corresponding EU funding applications and conceptual designs for water and wastewater networks as well as for wastewater treatment plants.

Fırtına Deresi near Çamlıhemşin, Turkey - © tolgaildun, Fotolia.com

 

The implementation of the seven master plans included preparing construction tenders for water and wastewater systems, including reservoirs, pumping stations, networks, and wastewater treatment plants. In addition, we were responsible for tendering supply contracts for equipment and tools for water utilities. The work was based on the FIDIC Yellow & Red Books – standardised contract templates for international construction projects developed by FIDIC, the International Federation of Consulting Engineers.

The municipalities involved are not located next to one another but scattered throughout the north and centre of the country, which posed a particular challenge. Around 1 million people will be benefitting from the improved water situation in the future.

As pioneers in integrated water projects, we provide support for the entire project cycle from master plans to site supervision and supply contract review.

Eric Kalmbach, Division Manager

 

Did you know?

The Instrument for Pre-Accession Assistance (IPA) is a financial instrument of the European Union aimed at driving reform in potential accession candidates; Turkey will receive €4.5 billion in the period from 2014 to 2020. The funding focuses mainly on establishing institutions and democratisation, socioeconomic and regional development, strengthening human capital and combating discrimination, and rural development.

Project Contact

Have questions about our project or services? Our expert is happy to help.

Person in a black suit jacket and light blue shirt stands indoors.

Eric Kalmbach

Division Manager

Eric Kalmbach brings expertise in environmental, water and transport infrastructure projects in developing countries.

Related Projects

Want to learn more about what we do? Browse our projects to discover our expertise in action.

Construction site with cranes, vehicles, and equipment, surrounded by buildings and roads.
Japan

Environmental Site Investigations and Remediation for Bosch Sites in Japan

Aerial view of an illuminated construction site at night, showing a large excavation area with structural supports, machinery, and surrounding roads.
Frankfurt, Deutschland

Extension of U5 Subway Line in Frankfurt – Connection to a New District 

SuedOstLink AC section between the converter station and the grid connection point
Germany, South-East

SuedOstLink: A Future Project for Sustainable Energy Supply