Sustainably Renewing Historic Infrastructure

Würzburg State Building Authority (German: Staatliches Bauamt Würzburg) has commissioned CDM Smith to restore the sewer network at Würzburg Residence. The planning approach brings together heritage conservation and the operational requirements of a museum, event venue and administrative site. CDM Smith is coordinating the planning services, structuring the works into prioritised construction phases and developing solutions that minimise interventions in the historic fabric and reduce disruption to ongoing operations.

Protecting Historic Sewers with Heritage-Sensitive Solutions

The historic masonry sewers are being repaired with particular care. The planning and technical solutions take account of the centuries-old building fabric and the requirements of the UNESCO World Heritage Site.

Modernising Supply and Disposal Infrastructure

The project covers the restoration of sewage disposal and water supply systems, the renewal of fountain technology, the use of perched groundwater and structural adaptations within the existing building fabric

Reusing Service Water Sustainably

CDM Smith is developing a concept to enable some of the pumped water to be used in the gardens or reused externally in future. This helps conserve resources while making practical use of existing infrastructure.

Coordinating Works Around Ongoing Operations

Prioritised construction sections, precise phasing and logistics planning, and early coordination with stakeholders are designed to take account of visitor flows, routing and sensitive time windows.

Where Heritage Protection Meets Modern Infrastructure

The restoration affects key areas of Würzburg Residence. Works on Residenzplatz and in the northern and southern courtyards are particularly time-critical. In addition to restoring the sewer network, CDM Smith is providing structural engineering for the sewers and landscape design services for the Court Garden. Modern requirements, including a sustainable irrigation system and the reactivation of existing storage structures, are being combined with the protection of the historic fabric. The works will be delivered in several construction phases, staggered over time or carried out in parallel depending on urgency. The aim is to create an economical, durable and technically sustainable concept that minimises disruption to ongoing museum, event and administrative operations.

Practices

InfrastructureWater ResourcesWaste Water

Markets

Public Sector

Fast Facts

1.3

km length of walk­a­ble his­toric masonry sewer network

2028

Start of con­struc­tion

Your Contact for Sewer Restoration Planning

Do you have questions about sewer restoration or the modernisation of existing wastewater instructure? Get in touch with our expert.

A man in a light gray suit and white shirt with a beard and short dark hair standing in a professional setting.

Benedikt Bauer

Project Manager

As a project manager in water and municipal infrastructure, he is responsible for projects in sewage disposal as well as supply and disposal infrastructure. His main areas of expertise include sewer restoration planning, general civil engineering and infrastructure engineering.

Related Projects

Want to learn more about what we do? Browse our projects to discover our expertise in action.

View All Projects
Berlin Tegel Airport terminal and control tower behind a fenced construction site under a clear blue sky
Berlin, Germany

Demolition and Site Clearance at Former Tegel Airport: Launching the Urban Tech Republic

View Project
Yellow train at a tree-lined station platform.
Berlin, Germany

New Reversing Facility for Berlin’s U3 Underground Line

View Project
Train passing under a bridge with construction equipment and gravel in the foreground.
Frankfurt, Germany

Connecting the Rhine-Main Region – Regionaltangente West

View Project
CDM Smith logo

Let’s Build Something Together

Have a project in mind or want to stay in the loop? Reach out to our team or subscribe to get the latest updates from our work.
Contact Us

Europe Headquarters

CDM Smith SE
Am Umweltpark 3-5
44793 Bochum, Germany
What We Do
  • Markets
  • Practices
  • Priorities
  • Projects
Who We Are
  • About Us
  • Career
  • Find Us
  • News
Resources
  • Resources
  • Legal & Terms of Use
  • Privacy Statement
  • Imprint
CDM Smith™ | CDM™ | WILBUR SMITH™
© 2026 CDM Smith. All rights reserved.