Frankfurt Airport Extension - New Terminal 3

For Frankfurt Airport’s Terminal 3, CDM Smith is responsible for ground investigation, construction supervision and PFAS soil management.

Client

Fraport AG

Location

Frankfurt am Main

Priorities

Connect with an expert

Person wearing a dark suit jacket and white shirt, standing in front of a blurred background.
Volker Schrenk
Division Manager

From Military Base to Modern Hub: Terminal 3

The new Terminal 3 will be built on the area of the former U.S. military base in the south of Frankfurt Airport. It is so become the most modern terminal in Europe. 

Geotechnics and Environmental Expertise

We prepared the terminal construction through comprehensive environmental, waste, and geotechnical investigations of the ground and groundwater.

PFAS-Contaminated Soil

For PFAS-contaminated soil, we developed a cost-effective and environmentally optimised soil management concept.

Initial situation: Expansion of Frankfurt Airport

Frankfurt Airport has been steadily growing alongside the Rhine-Main region for more than 80 years. 2005 saw the military use of the Rhein-Main Air Base in the southern part of the airport decom­mis­sioned before respon­si­bil­ity was transferred to the airport operator, Fraport AG. The old instal­la­tions needed to yield to the new Terminal 3 and extensions to the airport infra­struc­ture in this area. We carried out envi­ron­men­tal, waste and geot­ech­ni­cal studies on soil and groundwater, which included 33 core holes drilled down to a depth of 40 m.

 

Preparation, Establishment, and Excavation of the Construction Pit

For the new Terminal 3, a shallow foundation was implemented according to our recommendations. The longitudinal approach table utilised a pile foundation, designed according to the results of horizontal pile load tests and comprehensive 3D deformation analyses. The excavation pit for the terminal was constructed in two phases. First, the excavators worked their way down to the groundwater zone at a depth of 5.5 m in dry excavation over an area of 65,000 m². The final excavation depth in the groundwater zone had been reached under the protection of sheet pile shoring.

 

PFAS in the Soil

During the extensive sampling of the excavated soil, residues of the substance group of per- and poly­flu­o­ri­nated chemicals (PFC) or per- and poly­flu­o­ri­nated alkyl compounds - PFAS for short - were detected. Fraport commis­sioned CDM Smith to develop a soil management concept for Terminal 3, the aim of which is to recycle a large part of the cont­a­m­i­nated soil material in accordance with the require­ments of the remediation notice issued by the Regional Council or to dispose of excess excavated soil: CDM Smith supervised this soil management. For the temporary storage of excavated soil, CDM Smith planned an appro­pri­ately sized soil storage facility and prepared the approval documents in accordance with the Federal Emission Control Act (German: Bundes-Immis­sion­ss­chutzge­setz). However, the construc­tion of this storage facility was no longer necessary due to the reuse and disposal of the soil.

At that time, there were no federal regulations for handling PFAS cont­a­m­i­nated soil and there were only few precedents for soil recycling. Our experts at CDM Smith supported Fraport in all matters and took on advisory roles in discussions with the relevant authorities. We carried out construc­tion supervision for the envi­ron­men­tally responsible separation and disposal of the soil and created health and safety plans for handling the cont­a­m­i­nated material. Addi­tion­ally, we designed and sized a construc­tion water treatment facility for Terminal 3 and monitored its operation.

Currently, CDM Smith is managing the soil from smaller quantities of PFAS-cont­a­m­i­nated excavated materials generated during construc­tion activities at the terminal and is tasked with planning groundwater remediation at Terminal 3.

Our soil management strategy takes into account environmental and economic constraints by optimising recycling and disposal routes.

Dr Volker Schrenk, Division Manager

Insights into the Project Activities

Related Projects

Learn more about our services and expertise through our projects.

Construction site with cranes, vehicles, and equipment, surrounded by buildings and roads.
Japan

Environmental Site Investigations and Remediation for Bosch Sites in Japan

Waterfront view of historic and modern buildings along a sunny coast, with calm water in the foreground and hills in the background.
Turkey

Improving the Turkish Water Infrastructure

Aerial view of an illuminated construction site at night, showing a large excavation area with structural supports, machinery, and surrounding roads.
Frankfurt, Deutschland

Extension of U5 Subway Line in Frankfurt – Connection to a New District