Modernisation of the Rosental Waste Water Treatment Plant

CDM Smith supports the Modernisation of the Rosental Waste Water Treatment Plant with Specialist Groundwater Management Planning.

Client

Leipzig Municipal Waterworks

Location

Rosental, Leipzig

Connect with an expert

A person wearing formal attire with a dark blazer, light shirt, and vest, standing in front of a geometric background.
Maik von den Berg
Senior Project Manager

Expert Support Throughout Construction

The modernisation of the Rosental Waste Water Treatment Plant is one of the largest infrastructure projects ever undertaken by Leipziger Wasserwerke, with CDM Smith playing a central role. Acting as specialist planners, we are responsible for construction-phase groundwater management during HOAI service phase 5 and 6, making a decisive contribution to the safe delivery of the extensive construction works.

Increased Capacity

The expansion of the Rosental waste water treatment plant increases treatment capacity by more than 30 %.

Sustainable Expansion Without Land Take

In future, waste water from over 700,000 people can be treated on the existing site. The expansion is implemented entirely within the existing site – without any additional soil sealing.

Complex Planning for Safe Construction

The expansion of the mechanical and biological treatment processes necessitates extensive ground engineering measures. To ensure that construction can be carried out while the treatment plant remains fully operational, we are planning the entire groundwater control system, including:

  • the design of extraction wells, infiltration systems and pre-treatment facilities,
  • detailed planning of the well’s filters location, depth and structural design,
  • design of the technical equipment and electrical connection capacities,
  • definition of operating modes, including automated operation, and
  • coordination of dewatering targets based on the excavation configuration and the planned shoring system.

This planning approach ensures that the required groundwater drawdown is reliably achieved throughout all construction phases, both with and without infiltration.

 

A wastewater treatment facility with large tanks processing water. Pipes and equipment are visible, surrounded by trees.
Aeration tank with aeration system

Expert support throughout construction

CDM Smith will provide expert consultancy support throughout the construction phase until 2027. During this time:

  • up to 22 extraction wells will be operated,
  • a peak extraction rate of up to 450 m³/h will be achieved, and
  • an additional infiltration rate of up to 120 m³/h will be applied to maintain a stable groundwater regime.

Waste Water Treatment Plant Rosental

Project Contacts

Have questions about the project or our services? Our experts are happy to help.

A person wearing formal attire with a dark blazer, light shirt, and vest, standing in front of a geometric background.

Maik von den Berg

Senior Project Manager

As Senior Project Manager, Maik von den Berg manages complex projects in the fields of contaminated site investigation and assessment, as well as the planning of soil and in‑situ groundwater remediation measures.

A person wearing a black suit poses indoors against a geometric background of intersecting lines.

Sebastian Leschik

Senior Project Engineer

Dr Sebastian Leschik is an expert in contaminated site investigation and remediation, as well as groundwater and contaminant transport modelling. Another key focus of his work is the planning and evaluation of pumping tests.

Related Projects

Want to learn more about what we do? Browse our projects to discover our expertise in action.

View inside a modern, empty subway tunnel with tracks leading into the distance, illuminated by overhead lights.
Leipzig

The Fast Track Beneath the City: City Tunnel Leipzig

A view of a dam with concrete walls and a power pylon against clear blue sky, reflecting on the calm water below.
Romania & Serbia

WePass2: Making the Iron Gates passable for Danube sturgeon