Utilities can implement a tailored planning process known as reuse master planning, or reuse road mapping, to evaluate non-potable and potable reuse options.

This article has been adapted from “Addressing Water Supply Gaps with Reuse: Tailoring a Reuse Master Plan for Your Needs,” a recent webinar from CDM Smith featuring the expertise of Jillian Tedder, P.E. and Johnathon Sheets, PhD, PE.. Stream the full webinar here and earn a PDH for attending.

Utilities can implement a tailored planning process known as reuse master planning, or reuse road mapping, to evaluate non-potable and potable reuse options. This tailored process aims to optimize a reuse-inclusive water supply portfolio that will best serve their community into the future.

 

Types of reuse supply

Effluent from a water reclamation facility or wastewater treatment plant (reclaimed water) destined for reuse can follow various pathways dependent upon the type of reuse supply and end use.

  • For non-potable reuse: The effluent is directed to appli­ca­tions such as industrial reuse (cooling towers or process water makeup) or for public access uses such as irrigation.
  • For potable reuse: The effluent gets directed to an advanced treatment facility.
  • For indirect potable reuse (IPR): The effluent is directed to an envi­ron­men­tal buffer such as a river, lake, stream, or aquifer. This is followed by downstream drinking water treatment and intro­duc­tion into the drinking water distri­b­u­tion system.
  • For direct potable reuse: Unlike IPR, the presence of an envi­ron­men­tal buffer is absent. Purified water is sent to downstream drinking water treatment, or potentially directly into the drinking water distri­b­u­tion system. 
Diagram of water reuse system from residential use to conventional supply, including treatment and environmental buffers.

Reuse master planning is a tailored process that utilities can implement to evaluate non-potable and potable reuse options to optimize a reuse-inclusive water supply portfolio. It aims to achieve some or all of the following objectives:

  • Development of a holistic long-term water supply portfolio including non-potable and potable reuse
  • Ability to anticipate treatment, piloting, regulatory, and outreach require­ments for accurate planning-level cost development
  • Determine when/how much to invest in non-potable reuse when future imple­men­ta­tion of potable reuse seems likely
  • Integrate existing water reuse systems into expanded portfolio of reuse options
  • Meet sustain­abil­ity and/or renewable water goals
  • Plan for future regulatory compliance
  • Partner with multiple external agencies and/or companies
  • Make informed imple­men­ta­tion timelines 
     

There is no one-size-fits-all solution; reuse master planning be developed for small-scale appli­ca­tions (decen­tral­ized solutions) to large regional roadmaps/frameworks. Addi­tion­ally, individual companies or corpo­ra­tions are now developing their own reuse master plans to maximize avail­abil­ity of water resources and meet sustain­abil­ity initiatives.  The most common approach involves city or utility-wide reuse master plans however countywide or regional-scale reuse master plans are common where there are multiple stake­hold­ers.

Reuse master planning is part of an overall planning framework that includes one water planning, integrated water resources planning, water and wastewater masterplans as well as dedicated reuse master planning efforts. Utilities have many options including, but not limited to, the following: 

  • Traditional non-potable reuse planning: The typical process flow involves assessing large water users, estimating their monthly demands, and mapping out potential reclaimed water systems through geospatial analysis. In non-potable reuse scenarios, storage evaluations are critical to accommodate diurnal fluc­tu­a­tions to maximize reuse due to constant wastewater flow yet varying end user demands. This process is continually evolving with a growing emphasis on different types of reuse.
    traditional non-potable reuse planning

    Four-step water planning process: Large Water Users, Outdoor Water Use, Geospatial Analysis, Storage Evaluation with details.
  • Non-potable reuse roadmapping for industry:  The first effort in non-potable reuse roadmapping for industry involves developing demand projections for the desired end use (e.g. water demand for data centers). Water quality, both on the reclaimed water side and require­ments for the end use side is assessed and analyzed. Inves­ti­gat­ing the regulatory environment can be challenging due to varying existing regulations across states, but there is often an opportunity for industry to lead the way in shaping regulatory policies. Lastly, water avail­abil­ity is considered: Is there a local supply, or should on-site options be explored further?
Four-step process: Demand Projections, Water Quality, Regulatory Environment, Water Availability.
  • Integrated water resources planning/One Water plans: In IWRPs or One Water Plans, water, wastewater and reuse are planned together. The focus is typically on supply avail­abil­ity and risks (e.g. how can a utility or corporation fill future supply gaps?) and future treatment and conveyance needs. IWRP/One Water Plans identify cost-effective projects using a multi-criteria decision-making process, which is done over an extended timeframe, such as 100 years.
     

    Diagram showing the water cycle of municipal demand with water supply, treatment, green infrastructure, and reclamation processes.
  • Water and wastewater master planning: Water and Wastewater Master Planning is more of a discrete approach with each separate system (water, wastewater, reuse) planned inde­pen­dently. Water/WW Master Plans focus mainly on distri­b­u­tion and collection system facility sizing, such as pump station sizing. It develops a capital improvement program over an extended timeframe such as 20 years. 

    Diagram showing water cycle: supply, treatment, municipal demand, wastewater generation, stormwater discharge, environment.

 

Webinar

Addressing Water Supply Gaps with Reuse: Tailoring a Reuse Master Plan for Your Needs

Stream the full webinar, featuring the expertise of Jillian Tedder, P.E. and Johnathon Sheets, PhD, PE.

More resources on the topic

Circular diagram titled 'Water Integration Tool' with icons on a water ripple background.
Insight

Creating supply resiliency with the Water Integration Tool

Learn more about a tool that helps utilities evaluate the full benefits of a One Water planning and policy analysis approach.
Workers in safety vests installing large membrane bioreactor filters at a treatment plant.
Insight

Best practices using membrane bioreactors in potable reuse

Membrane experts Greg Wetterau and Anthony Zamarro explain the advantages of MBRs in a potable reuse train and how they are incorporated into potable reuse schemes.
Interior of a water treatment facility with control panels and filtration systems.
Insight

Piloting for water reuse

Jill Tedder, discipline leader for water reuse in the Southwest, sat down to discuss her experience with piloting and how it’s evolving water treatment for the future.
Glowing digital envelopes on a dark background, symbolizing email communication.

Stay up to date on advanced water treatment

We're committed to strengthening water supply portfolios where they are most needed today and will be tomorrow. Opt in to our newsletter to learn more.