What to expect from a lead service line replacement program

Lead service line replacement programs are a collaboration between the utility and customers. This article provides a general overview of replacement programs.

Watch the lead service line replacement process in action 

A typical lead service line replacement program includes an inspection, construc­tion, actual replacement, and flushing. Learn more about what each step entails below.

Review, inspect, locate

Before work begins, a utility repre­sen­ta­tive may contact you to review the service line replacement process and inspect the inside of the house. Utilities may require you to sign paperwork (a right of entry form or replacement agreement) which gives contractors permission to access your property and remove the portion of the service line that you own.  

During the inspection, the contractor will check where the water meter is, where the service line enters the property, and to test if you have a lead pipe. If the pipe is lead on the portion you own, we recommend you sign the right of entry form to have the pipe replaced. If only the service line from the water main to the curb is lead, then that portion will be replaced and reconnected by your utility.

Construction day preparation

On construc­tion day, water service will be turned off for no more than 8 hours, and some sections of your street may be closed for a portion of the day. Many service line replace­ments may take place at the same time in your area – construc­tion workers and machines could be in your neigh­bor­hood anywhere from a day to a few weeks.

The property owner, or a designee 18 years or older, must be on site while contractors complete the replacement. This will take less than a day. They will take “pre-construc­tion” photos of the yard, the street, and where the service line enters the house to ensure everything is brought back to pre-construc­tion conditions. 

Service line replacement

Contractors will use a backhoe to dig a hole at the curb stop and in the street to access the service line and water main. Crews use trenchless methods to disturb your property as little as possible.

Trenchless pull-through method: disconnects the old service line from the street water main. Inside the house, crews detach where the line connects to plumbing. A cable is fed through the old service line with a coil attached to one end of the new pipe. The crew uses equipment to pull the cable with the lead service line and the new pipe through the ground. The new pipe is then connected to the water main.

Boring or push method: disconnects the old lead service line from the water main and leaves the old pipe in the ground. The old service line is no longer functional and can’t contribute any more lead to your drinking water. A boring machine drills a hole for the new service line, and crews attach the new pipe to the drill and pull it back through the hole. Finally, they connect the line to the water main and your indoor plumbing.

The flushing process

Crews will perform an important process called flushing to remove any remaining lead particles from inside the pipes. The contractor will leave steps for how to flush the rest of the house to remove any remaining lead particles. The process is very important and involves running ALL taps inside the house for at least 30 minutes to flush out the lead.  

After flushing, the EPA strongly encourages customers to use a filter certified to meet the NSF 42 and 53 Standards for removing lead in the pipes for drinking and cooking water for 6 months after the service line is replaced. The EPA also recommends that you clean out all aerators on the ends of your faucets and peri­od­i­cally run your water to remove any collected lead particles. Your utility will offer to sample your water 3 to 6 months after replacement to confirm low lead levels.

Copper pipe draining water into a bucket during service line replacement.
Flushing is a crucial step and involves running ALL taps inside the house for at least 30 minutes to flush out reminaing lead.

More resources on this topic

Child's hand near a water fountain with water flowing, indoors.
Insight

School and child care sampling: LCRI requirements

What do water systems need to know about lead testing in schools and child care facilities under the LCRI? We asked environmental health expert Davida Judelson, MPH, to break it down.
Construction worker in safety vest and hard hat shows a woman information on a tablet outside a house.
Insight

How to talk about lead programs with the public

As part of the Lead and Copper Rule Improvements (LCRI), water utilities are required to communicate with residents and businesses more than ever before about lead in drinking water. We’ve compiled four best practices to effectively communicate with customers.
Construction workers with excavators on a street.
Insight

Is your utility ready for the LCRI? Lessons from Illinois's early experience

Illinois utilities have been operating under stricter lead regulations since 2022, and Chicago's former water commissioner, Andrea Cheng, PhD, PE, shares lessons on navigating new sampling requirements, boosting resident engagement, and coordinating complex inventory efforts.
Glowing digital envelopes on a dark background, symbolizing email communication.

Sign up for Lead and Copper Rule updates and more

Sign up for our newsletter to stay in the know on regulations, recent projects and the latest innovations to tackle lead in drinking water.