Geotechnical Engineering & Engineering Artistry in the Heart of Berlin

Extension of the U5

The gap closure connects the U5 with the U55, creating a continuous route from the main station to Hönow. Three new stations and two tunnel sections improve accessibility to Berlin's city centre.

Construction History & Geological Context 

Construction took place in difficult ground conditions with densely packed sand, boulder clay, boulders and high groundwater levels. In addition, the Spree, the Spree Canal and historic foundations had to be safely crossed.

Innovative Construction Methods

The special methods used included jet grouting, diaphragm walls, ground freezing and compensation injections. A special feature was the passage of the tunnel boring machine through prefabricated excavation pits that had not yet been dug.

CDM Smith's Services

Since 1995, CDM Smith has been supporting the project with geotechnical planning, monitoring, measurement programmes, soil management and waste disposal monitoring – from construction supervision to detailed tunnel planning.

The project "gap closure U5" extends the traditional line U5 from Hönow via the Alexan­der­platz to the Brandenburg Gate and connects it with the U55 line to Berlin Central Station, which was opened in 2009. Over 150,000 passengers per day are expected on the newly built line section with their three new metro stations–a large project that improves the mobility and the quality of life of the citizens of Berlin.

The Berlin metro’s U5 line runs from Hönow in East Berlin to Alexan­der­platz in the city centre. A two-stage extension of the route was undertaken in order to connect the eastern areas of the city better to the city centre. The first section between the central station and the Brandenburg Gate, which is not connected to the rest of the rail system, was opened in 2009 as line U55. The second section - the gap closure between Alexanderplatz and the Brandenburg Gate underground stations - had been under construction from 2012 to 2020. In addition to the construc­tion of two tunnels, the project includes a track-switching facility and three metro stations, Rotes Rathaus, Museuminsel and Unter den Linden.

Remains of buildings and foundation elements of past building epochs, closely stepped sands, zones with boulder clay and stones as well as a high groundwater level of about 3 m below ground level characterize the subsoil in the area of the construction project. These ground conditions, which are typical for Berlin, posed a great challenge for the planning and execution of the excavation pits and the tunnel driving.

Even the basic conditions above the earth also made special foundation engineering more difficult. For example, the tunnel boring machine had to undercut the Spree and Spreekanal on both sides of the Museum Island as well as buildings, historical foundations and the Humboldtforum, which is currently under construction. A special feature was that the excavation pits for the railroad station buildings, which were initially made with walls and base but not excavated, were driven through by the tunnel boring machine during the tunneling process. Only after this was the excavation of the excavation pits and the installation of the railroad station buildings. In this way the danger of water ingress in the transition areas between tunnel and excavation pits was reduced.

CDM Smith is recognised as a service provider for integrated solutions in tunnel construction with difficult technical challenges. 

Georg Breitsprecher, Project Manager

 

CDM Smith has been contributing to the success of the project since 1995 – first as a construction site consultant and planner, and then, since 2010, as a geotechnical and tunnelling consultant for the detailed design and implementation. Our consulting services was based on a variety of civil engineering specialities such as jet grouting, diaphragm wall construction, ground freezing and compensation grouting. We were also responsible for geodetic and geotechnical measurement programmes in monitoring and evaluating the shield tunnelling process as well as soil improvement and structural deformation. Our services also covered soil management as well as soil and waste disposal alongside disposal supervision.

Our geot­ech­ni­cal consultancy services cover, among other things, special-purpose construc­tions such as jet-spraying, slit-wall construc­tion, foundation grounding and compen­sat­ing injection as well as geodetic and geot­ech­ni­cal measurement programmes for the monitoring and evaluation of shield drives. CDM Smith advises the client on soil management and soil and waste disposal and takes over the overall disposal control during construc­tion work.

 

 

Did you know?

For the section of the gap between the Marx-Engels-Forum and the Brandenburg Gate the tunnel-driving machine "Bärlinde" was used. Special technical challenges lurk in the sandy Berlin subsoil, in the form of larger boulders, old buildings as well as the challenges offered by the crossing of the Spree. "Bärlinde" was produced by Herrenknecht specifically for the Berlin site.

Practices

GeotechnicsInfrastructureTunnellingSolid Waste

Markets

Transportation Infrastructure

Project Figures

6.7 m

di­am­e­ter of tunnel boring machine

2.2 km

tunnel section

Project Contacts

Have questions about our project or services? Our expert is happy to help.

A person wearing a dark blazer and white shirt, with their face blurred, standing in front of a dark background.

Georg Breitsprecher

Senior Business Development Manager

Expert in ground improvement, injection techniques, excavations and specialist foundation engineering.

On‑Site Insights

Related Projects

Learn more about our services and expertise through our projects.

Yellow train at a tree-lined station platform.
Berlin, Germany

New Reversing Facility for Berlin’s U3 Underground Line

View Project
Train passing under a bridge with construction equipment and gravel in the foreground.
Frankfurt, Germany

Connecting the Rhine-Main Region – Regionaltangente West

View Project
Overhead view of a highway, construction site, and snowy landscape.
Leipzig

A72 – Closing the Final Gap

View Project
CDM Smith logo

Let’s Build Something Together

Have a project in mind or want to stay in the loop? Reach out to our team or subscribe to get the latest updates from our work.
Contact Us

Europe Headquarters

CDM Smith SE
Am Umweltpark 3-5
44793 Bochum, Germany
What We Do
  • Markets
  • Practices
  • Priorities
  • Projects
Who We Are
  • About Us
  • Career
  • Find Us
  • News
Resources
  • Resources
  • Legal & Terms of Use
  • Privacy Statement
  • Imprint
CDM Smith™ | CDM™ | WILBUR SMITH™
© 2026 CDM Smith. All rights reserved.