Skip to Main Content
CDM Smith logo
CDM Smith logo
Project background not configured

Practices

Flood ProtectionWater Resources

Markets

Public Sector

Flood in Poland as the Trigger for Comprehensive Flood Protection

In the summer of 1997, six days of torrential rain battered Poland. The Odra river basin, covering more than one third of the country, was flooded; more than 50 people lost their lives and the flooding caused a significant damage valued at € 1.3 billion. The Odra River Basin Flood Protection Project wants to prevent similar catastrophes in the future. CDM Smith assessed the flood risk management plans for the Odra river basin on behalf of the National Water Management Authority.

View on Odra River in Poland
© Franciszek/ Adobe Stock

 

European Framework for Flood Risk Management

Flood risk management plans are an important component of the assessment and management of flood risks as required by the provisions of Directive 2007/60/EC of the European Parliament and Council of 23 October 2007. To implement the European Union Flood Directive, flood risk management plans for Poland had to be developed and assessed before 2016. In 2014, after careful analysis and diagnosis, several drafts of the flood risk management plan were completed. These comprehensive documents were drafted using earlier preliminary flood risk assessment, flood threat maps and flood risk maps that included a description of the objectives of flood risk management and a list of necessary actions to be taken during specific planning cycles.

 

Scope of the Strategic Environmental Impact Assessment

The President of the National Water Management Authority is responsible for drafting flood risk management plans for flood plains. According to the regulations in effect, draft plans outlining the framework for subsequent measures with potential impact on the environment cannot be adopted without a prior strategic environmental impact assessment. Administrative proceedings on the strategic environmental impact assessment for a draft flood risk management plan for the Odra river basin involved the following in particular:

  • Agreeing on the level of detail of information included in the drafted environmental impact assessment document,
  • Drafting an environmental impact assessment document towards the flood risk management plan for the Odra flood plain,
  • Arrangements with administrative authorities,
  • Organising and conducting consultations on the drafted documents with members of the public.

Practices

Flood ProtectionWater Resources

Markets

Public Sector

Facts & Figures

20+

in­ter­dis­ci­pli­nary experts

>35 %

covered area of Poland

Headshot Jolanta Samsel

Floods are a natural occurrence that we need to become accustomed to.

Jolanta Samsel

Business Development Manager

Related Projects

Learn more about our services and expertise through our projects.

View inside a modern, empty subway tunnel with tracks leading into the distance, illuminated by overhead lights.
Leipzig

The Fast Track Beneath the City: City Tunnel Leipzig

View Project
A wastewater treatment plant featuring large circular basins filled with water, surrounded by buildings and trees in the distance.
Rosental, Leipzig

Modernisation of the Rosental Waste Water Treatment Plant

View Project
A view of a dam with concrete walls and a power pylon against clear blue sky, reflecting on the calm water below.
Romania & Serbia

WePass2: Making the Iron Gates passable for Danube sturgeon

View Project
CDM Smith logo

Let’s Build Something Together

Have a project in mind or want to stay in the loop? Reach out to our team or subscribe to get the latest updates from our work.
Contact Us

Europe Headquarters

CDM Smith SE
Am Umweltpark 3-5
44793 Bochum, Germany
What We Do
  • Markets
  • Practices
  • Priorities
  • Projects
Who We Are
  • About Us
  • Career
  • Find Us
  • News
Resources
  • Resources
  • Legal & Terms of Use
  • Privacy Statement
  • Imprint
CDM Smith™ | CDM™ | WILBUR SMITH™
© 2026 CDM Smith. All rights reserved.