A fast-tracked FAB chemical facility 

CDM Smith designed a 6M sq. ft. FAB chemical facility with advanced systems, 3D modeling, and global collaboration. 

Client

Confidential Client

Location

North America

Practices

Connect with an expert

Man in a dark suit with a patterned blue tie, standing outdoors against a blurred building background.
Paul Bedigian, PE
Senior Structural Engineer

Using advanced 3D design tools, CDM Smith delivered a chemical handling facility for a Texas semiconductor FAB on a fast‑track schedule. 

Our team designed a large‑scale chemical handling and storage facility to support a leading semiconductor fabrication campus. The work included two multi‑story structures integrating advanced chemical systems critical to fab operations. The project was completed on a fast‑track schedule using coordinated 3D modeling and close collaboration across global teams to ensure safety, constructability and precision at scale. 

Advanced chemical facility design 

The facility was designed to safely store, transfer, and manage specialty chemicals essential to high‑volume semiconductor manufacturing, supporting reliable operations while meeting stringent safety and regulatory requirements. 

Fast-track, high-precision delivery 

3D drafting and automated model reviews enabled the team to deliver precise designs on an accelerated timeline.

Multi-story, integrated systems 

Two three‑story structures integrate multiple chemical systems within a compact footprint, supporting efficient operations while meeting stringent safety and performance requirements. 

Global collaboration 

Shared digital models and standardized workflows enabled alignment across disciplines and geographies, supporting consistent quality and schedule certainty. 

This project showcases technically rigorous, safety‑focused facility design delivered at scale. By combining chemical handling system experience with advanced digital tools, the team created a facility that meets the operational demands of a modern fabrication campus while maintaining precision under schedule pressure.

Design decisions were driven by the need for operational reliability, safe chemical management, and seamless integration with active fab processes. The approach emphasized clear coordination, constructability, and reliability—qualities essential for mission‑critical industrial environments. The result is a flexible, high‑performance chemical facility that demonstrates how thoughtful design and disciplined execution can support complex manufacturing infrastructure. 

Curious to learn more?

Reach out to an expert to find out how we delivered this project.

Man in a dark suit with a patterned blue tie, standing outdoors against a blurred building background.

Paul Bedigian

Senior Structural Engineer

Paul is a structural engineer with over 35 years of experience in water and wastewater treatment facility design.

Other projects in this region

A modern building with solar panels on its roof, surrounded by vegetation, ponds, and farmland, under a setting sun.
North America

Global due diligence for mission-critical water infrastructure 

Switchyard with take-off tower and transformer under blue sky.
North America

Powering hyperscale data center expansion 

A facility housing water treatment equipment including cylindrical units in metal frames, a motor, and control panels, lit by industrial lighting.
North America

Reclaimed water treatment system for a data center campus