A long-term plan to protect Lake Erie's water quality 

In 2011, the Northeast Ohio Regional Sewer District (NEORSD) entered an agreement to implement a long-term plan to significantly reduce combined sewer overflows into Lake Erie and nearby waterways. Working with the U.S. EPA, Ohio EPA, and the Department of Justice, NEORSD launched a 25‑year effort to improve water quality across the region.

The program is designed to remove roughly 4 billion gallons of overflow each year, with green infrastructure solutions managing another 44 million gallons annually. These improvements are part of the East 140th Street Consolidation and Relief Sewer project and the Union/Buckeye Green Infrastructure project in Cleveland, led by CDM Smith.

Integrated sewer and stormwater management

We delivered tunneled sewer upgrades with three bioretention basins capturing stormwater from 223 acres. Built on vacant land and tied to a new separated sewer system, the basins manage 48.3 million gallons annually, reducing sewer overflows. 

Flood prevention  

By combining bioretention basins, underground storage, overland flow and targeted sewer redirection, our team navigated cost and site challenges in the Union/Buckeye area to manage 8 million gallons of stormwater annually. 

Celebrating community through art and design 

During the design of the Buckeye Gateway site, the team partnered with local artists to add poetry, sculptures and custom details throughout the space. From cast poetry inscriptions to splash‑themed bike racks, these elements reflect community pride and local identity. 

Engineering solutions designed for water and people 

The sites feature new accessible sidewalks and loop paths, open lawn space, benches, picnic seating, and bike amenities. At the Gateway site, underground stormwater storage supports a welcoming public space plaza with curved seating walls, shade plantings and a rain garden. 

By prioritizing community needs, these stormwater facilities go beyond managing water to improve daily life in surrounding neighborhoods. CDM Smith worked alongside NEORSD, contractors and local artists to deliver a green infrastructure plan that brings natural public space to the community. 

Practices

Water Resource Infrastructure and Resiliency

Markets

Municipal Utilities

Priorities

Complete Corridors

Curious to learn more?

Reach out to an expert to find out how we delivered this project.

Person in a white shirt and blue tie stands indoors with plants in the background.

Michael Schmidt, PE, BCEE, D.WRE

Water Resource Infrastructure & Resiliency Practice Leader

Mike has experience in planning, modeling, permitting, design, climate resiliency and public outreach for watersheds, stormwater, green infrastructure, coasts and ecosystems.

Other projects in this region

View All Projects
Toll gantry with a blue cloudy sky
Boston, Massachusetts

Converting the Mass Pike to electronic tolling

View Project
A sunny view of Arsenal Park featuring red brick buildings, landscaped paths, and green spaces under a blue sky.
Watertown, Massachusetts

Turning an industrial site into a community park  

View Project
Aerial view of Cramer Hill Waterfront Park, Camden, showing waterways and greenery, with city skyline in the background.
Camden, New Jersey

Revitalizing Camden’s waterfront

View Project
Glowing digital envelopes on a dark background, symbolizing email communication.

Learn more about Complete Corridors

Find out how forward-thinking communities improve mobility, promote equity and enhance resiliency through our monthly newsletter.

Sign Up
CDM Smith logo

Let’s Build Something Together

Have a project in mind or want to stay in the loop? Reach out to our team or subscribe to get the latest updates from our work.
Contact UsSubscribe

World Headquarters

75 State Street
Suite 701
Boston, MA 02109 USA
What We Do
  • Markets
  • Practices
  • Priorities
  • Projects
  • Innovation and Technologies
Who We Are
  • About Us
  • Careers
  • Cultural Threads Blog
  • Find Us
  • News
Resources
  • Insights
  • Subcontracting
  • Webinars
  • Legal & Terms of Use
  • Privacy Statement
  • Accommodation Request
  • California Privacy Rights
  • Contract Vehicles
CDM Smith™ | CDM™ | WILBUR SMITH™
© 2026 CDM Smith. All rights reserved.