So like I mentioned before, there's only a limited amount of right of way in a lot of locations. Sometimes you can buy new right of way but that's not always the case, so being able to maximize the existing right of way is of great benefit to the client and to taxpayers.
On some projects, you don't have to necessarily try to squeeze everything into one individual roadway corridor. It can be a couple of parallel routes that are also utilized in order to fit all the elements in. So, for instance, one corridor might have bus lanes and travel lanes and other things, but there's not a lot of space for bike infrastructure. So on the next parallel route, you could put in a real nice cycle track or bike lanes. And that way, it's one block over in an urban situation, so it's not out of the way for anyone necessarily and you're still getting all those needs met.
You can use this same strategy with utilities. Some utilities might be better in one corridor than another, and just having that plan upfront can really help you maximize the right of way.