Building up communities with Complete Corridors

Jenny Humphreys, senior transportation planner and CDM Smith’s resident Complete Corridors expert, discusses her passion for this new infrastructure improvement philosophy and shares her client success stories.

Jenny explains the what, how, where and why of Complete Corridors 

Christine Barrett

What’s so different about Complete Corridors, compared to how we tradi­tion­ally plan for and execute cities’ infra­struc­ture improve­ments? 
Person in a navy blazer and white shirt standing outdoors by trees.

Jenny Humphreys

So many of us look at a corridor and think, “Oh, yes, that’s how I get from my house to my office.” But if you take a step back you realize that there’s so much more going on beyond the traditional use of that roadway or street: water, wastewater, power and all the other places around, under and above the roadway. Complete Corridors are all about looking at a corridor in a much more complete way. The ultimate goal is to improve cities’ master planning for all different types of infra­struc­ture, so that means better movement of people and goods, of course, but also improve­ments to the flow of data and water and all the other infra­struc­ture moving through that corridor.  

Christine Barrett

When you look at the impact Complete Corridors can have, what are you most excited about? 
Person in a navy blazer and white shirt standing outdoors by trees.

Jenny Humphreys

Gosh, so many things! What I’m probably most excited about is how we can use the Complete Corridors approach to solve as many problems and challenges as possible. Whenever we approach a traditional trans­porta­tion project we think, “OK how do we move more cars and goods or other types of mobility more efficiently through this corridor?” I mean, we’re trying to fix traffic, right? And sure, we may also want to fix other trans­porta­tion problems—safety issues, improving walkability, acces­si­bil­ity for transit users and a whole list of others. But what gets me so excited about Complete Corridors is that it goes beyond our standard trans­porta­tion strategies and pushes us to integrate all different types of infra­struc­ture strategies into our corridor planning. Suddenly it becomes so much more than moving people and goods. How can we improve drainage? How do we better integrate our construc­tion projects? How can we integrate better water quality treatment into our roadway design projects? These are the things community leaders aren’t necessarily asking for but will need in the future, and Complete Corridors help them streamline their improvement plans.  

Christine Barrett

What advice might you give to a skeptical client who’s hesitant to adopt this new philosophy? 
Person in a navy blazer and white shirt standing outdoors by trees.

Jenny Humphreys

This is so important to address because while lots of clients recognize the benefits of integrating our design and building efforts into singular activities within a corridor, they also recognize that it’s a challenge because this isn’t how we tradi­tion­ally design and build projects. Let me give you a quick example to showcase the power of Complete Corridors. Say you have a road widening project—well, that’s a singular design and construc­tion effort. And then a few years later you have a water line replacement project accommodate new development in the area. So we go back and dig up that roadway to install the new water line. Most clients understand that we should be proactively talking about these projects together and digging once rather than just tackling our construc­tion projects one by one, but we recognize this is a mindset shift that may take time for some clients to get used to. Rest assured, this is the future of trans­porta­tion planning and is a real game-changer in terms of helping communities boost effi­cien­cies. 

Christine Barrett

That’s a great example! Any others you’d like to share that showcase the power of Complete Corridors?  
Person in a navy blazer and white shirt standing outdoors by trees.

Jenny Humphreys

In the city of New Orleans, CDM Smith was selected to repair roadways under the Hurricane Katrina recovery plan. They are on the clock to repair a lot of damaged roads, so we started with a traditional program management approach. But in the spirit of Complete Corridors, we are also looking at all the other infra­struc­ture plans within the city so we can evaluate the potential to integrate some of the city’s other large-scale construc­tion efforts while we are out there doing roadway repairs. It’s a welcome change to the standard program management strategies because we’ve been able to save the city lots of time and money along the way. On the other end of the spectrum, we’re also collab­o­rat­ing with a small-town, rural client in Texas to prepare a stormwater master plan. Unlike New Orleans, this client doesn’t have the size or the funds to build out separate plans for their trans­porta­tion system, their stormwater system and their green infra­struc­ture improve­ments, so they were eager to utilize our Complete Corridors approach to integrate all their infra­struc­ture assessments into one plan. This really goes to show that Complete Corridors can be applied for any client on any scale or budget; all it takes is a desire to think differently about how your city’s departments collaborate and a willingness to work together. 

More resources on this topic

Aerial view of a solar farm beside a highway and fields, with a small residential area in the background.
Insight

Are tollways ground zero for the next wave of renewable energy?

Jonathon Hart, transportation revenue forecasting expert, shares his predictions on how tollways can play a role in the clean energy revolution.
A bioretention garden with pink flowers and a sign, surrounded by trees and a small house in the background.
Insight

Three tips for recreating natural resiliency with green corridors

Green infrastructure and Complete Corridors are complementary approaches in urban planning that, when integrated, create more sustainable and resilient communities. Here's how you can start developing your own green corridor.
SunRunner bus at a dedicated transit lane near a Publix and palm trees.
Insight

Breaking down bus rapid transit lane options

We define the benefits and motivations behind the various types of bus rapid transit (BRT) lane types that make traveling by BRT so rapid.
Glowing digital envelopes on a dark background, symbolizing email communication.

Learn more about Complete Corridors

Find out how forward-thinking communities improve mobility, promote equity and enhance resiliency through our monthly newsletter.