Choosing from the menu of alternative delivery choices is a complex task, but finding innovative ways to obtain better value for your infrastructure investment becomes easier as you build more projects in your portfolio. Each alternative delivery method offers a different set of benefits when compared to traditional design-bid-build. To help you better understand your options, we’ve developed this guide to the three most common forms of alternative delivery.
What's the best method?
Construction manager-at-risk (CMAR)
How it works: The owner contracts separately with the designer and construction manager (CM). The CM acts as a consultant during design and as a general contractor during construction. The CM’s responsibilities include procuring equipment and subcontracts and delivering the project within a fixed, negotiated price. In most states, the CM must be a licensed general contractor.
Why it works: The CM is incentivized to provide valuable constructability insight during design that can avoid major costs and delays. All subcontracting tasks are competitively bid in an open and transparent fashion, which can result in major cost savings. The CMAR approach helps expedite project schedule through designer-contractor collaboration, and gives owners the ability to choose preferred equipment without sole-sourcing.
What you need to know: If you are putting your toe into the waters of alternative delivery with a CMAR project, it is best to start with a medium-sized project and choose an experienced team that can help you through the process. Also, while the transparent bidding process is a strength of CMAR, having to bid everything out is labor-intensive for the owner’s staff and the engineer. Moreover, the owner may miss out on some efficiencies that might otherwise have been achieved by linking some of the subcontracted tasks together in a single bid.
The best choice for: Owners trying alternative delivery for the first time; owners that want to achieve the maximum degree of budget control; owners that desire complete transparency in the bidding process.