Pennsylvania advances safety and mobility through a statewide rapid bridge replacement program 

Pennsylvania faced a large inventory of structurally deficient bridges and limited funding to address them through traditional delivery. PennDOT partnered with CDM Smith to identify the right path forward. The result aimed to accelerate replacements, reduce public inconvenience, and create a cost-effective statewide solution. 

Screening bridges strategically 

4,000 deficient bridges were narrowed to 558 best-fit sites using 35 detailed factors on cost, condition, and readiness.  

Driving design efficiency 

Standardized bridge designs enabled assembly-line production, reducing costs and cutting delivery timelines.

Fast-tracking early work 

The procurement allowed PennDOT to advance clearances for 88 sites while partners secured remaining approvals. 

Optimizing maintenance roles 

A phased maintenance approach allocated respon­si­bil­i­ties to the party best positioned to perform each activity. 

Construction workers building bridge foundations by a river, using wooden frames and rebar, surrounded by earth and rock.
Typical bridge foundation construction activities on one of PennDOT's many bridge replacement projects. 


With project completion, all 558 poor-condition bridges were replaced, most ahead of traditional schedules and with minimal disruption to travelers. The program earned national recognition, including multiple industry awards, demonstrating how an innovative P3 model can modernize critical infrastructure at scale. 

Curious to learn more?

Connect with an expert to see how we delivered this project.

Munoz_John_2025.jpg

John Muñoz

Alternative Delivery and Finance Discipline Leader

With an extensive background in transportation engineering, John is an accomplished tolling expert with 20 years of P3 project delivery experience.

Practices

Transportation

Markets

State Department of Transportation

Other projects in this region

View All Projects
Detroit skyline at night with colorful lights reflecting on the water's surface.
Detroit, Michigan

Outfall upgrade for the nation’s largest WWTP 

View Project
Aerial view of I-95 construction, with vehicles on lanes, industrial area to the left, and city skyline in the distance.
Philadelphia, Pennsylvania

Reviving mobility on I-95 in Philadelphia

View Project
Aerial view of a highway overpass with onramps, surrounded by greenery and urban buildings.
Philadelphia, Pennsylvania

Improving mobility on I-95 with PennDOT’s Complete Corridors vision

View Project
CDM Smith logo

Let’s Build Something Together

Have a project in mind or want to stay in the loop? Reach out to our team or subscribe to get the latest updates from our work.
Contact UsSubscribe

World Headquarters

75 State Street
Suite 701
Boston, MA 02109 USA
What We Do
  • Markets
  • Practices
  • Priorities
  • Projects
  • Innovation and Technologies
Who We Are
  • About Us
  • Careers
  • Cultural Threads Blog
  • Find Us
  • News
Resources
  • Insights
  • Subcontracting
  • Webinars
  • Legal & Terms of Use
  • Privacy Statement
  • Accommodation Request
  • California Privacy Rights
  • Contract Vehicles
CDM Smith™ | CDM™ | WILBUR SMITH™
© 2026 CDM Smith. All rights reserved.