Thinking outside the box at the Myra Lane Bridge

We helped INDOT take a strategic approach to create the Myra Lane Bridge, streamlining two proposed bridges into a single structure to mitigate environmental impacts and save costs.

Client

INDOT

Location

Morgan County, Indiana

Connect with an expert

Gentry_Beau.jpg
Beau Gentry PE, PMP, CPESC
Senior Project Manager

Bringing safe and efficient transportation solutions to life

INDOT and CDM Smith worked together on the sixth and final section of the “I-69 Finish Line” grand roadway revamp. Bringing together knowledge in transportation and bridge design, ITS corridor design, public engagement and stakeholder coordination, the project team brought innovative solutions to a local community.

Delivering on large-scale project scope

Work encompassed 4 miles of interstate construction, 5 miles of local access road construction, six bridge crossings and multiple minor stream crossings.

Innovation for INDOT

Experts streamlined what was originally proposed as two bridge structures into a single cost-saving, environmentally conscious design.

A “think-outside-the-box” approach

The team was able to minimize impacts to three local fishponds, ensure safe transportation to the local church and limit future maintenance costs for INDOT.

Reducing environmental impacts, saving costs

CDM Smith’s multidisciplinary team decided on the best plan of attack for the project’s design, prioritizing both cost savings at environmental protections.

"Managing this project was a privilege," said Beau Gentry, bridge discipline lead and project manager. "This project not only resonated positively within the local community but also achieved resounding success in the eyes of our client." 

In total, the entire I-69 connection between Evansville and Indianapolis, Indiana, is a $2 billion program and incorporates more than 26 miles of new interstate highway, over 35 lane-miles of new local access roads, 39 new bridges and 35 existing bridges.

Curious to learn more?

Connect with an expert to find out how we delivered this project.

Gentry_Beau.jpg

Beau Gentry

Senior Project Manager

Beau is a senior project manager known for his strong communication skills with experience in transportation engineering, highways, bridges, construction and drainage.

Other projects in this region

Detroit skyline at night with colorful lights reflecting on the water's surface.
Detroit, Michigan

Outfall upgrade for the nation’s largest WWTP 

Aerial view of I-95 construction, with vehicles on lanes, industrial area to the left, and city skyline in the distance.
Philadelphia, Pennsylvania

Reviving mobility on I-95 in Philadelphia

Aerial view of a highway overpass with onramps, surrounded by greenery and urban buildings.
Philadelphia, Pennsylvania

Improving mobility on I-95 with PennDOT’s Complete Corridors vision