Skip to Main Content
logo
WePass2 Logo wideWePass2 Logo vertikal

WePass2: Making the Iron Gates passable for Danube sturgeon

The impact of the dams and their hydropower plants has resulted in sharp declines of the formerly six native Danube sturgeon species in recent decades. Fish passage restoration is a high priority in the Danube River Basin Management Plan.

Client

European Commission

Location

Romania & Serbia

Connect with an expert

Person in a dark suit with a blue tie standing against a brick wall backdrop.
Marq Redeker
Senior Business Development Manager

Sturgeon and the Danube

Having remained largely unchanged in some 200 million years, sturgeon fish species represent a natural heritage of the Danube River Basin. The ICPDR has adopted the ‘living fossil’ and threatened Danube Sturgeon as its flagship fish species. Sturgeon require different habitats and struc­turally varied river landscapes at different stages of their life cycle, and due to their sensitivity to envi­ron­men­tal pressures, sturgeons are an indicator species for the ecological quality of rivers – thus making them the ideal candidate to represent the region’s various threatened migratory fish species, and its general ecological well-being as a whole.

References to sturgeon conser­va­tion activities can be found in the national River Basin Management Plans of the Danube countries, the Danube River Basin Management Plan-Update 2021 and in the Danube Ministerial Decla­ra­tions 2016 and 2022. Thus, advancing broad public awareness and political commitment for Danube Sturgeons – in addition to other char­ac­ter­is­tic migratory fish of the Danube – are a priority towards safe­guard­ing the ecosystem of the Danube River Basin as a whole.

 

Feasibility for the Iron Gate Dams

The Iron Gate Dams and Hydropower Plants I and II (aka Porțile de Fier / Đerdap) on the border between Romania and Serbia represent the most significant river continuity inter­rup­tion on the main stem of the Danube River, repre­sent­ing impen­e­tra­ble obstacles for migratory fishes. These schemes date back to the 1960s; the first dam having been completed in 1972, and the second in 1984. While an undoubtedly exemplary inter­na­tional project between the two countries, and a vital source of carbon-free energy for the region, the Iron Gate Dams have also had adverse ecological effects, including blockage of the migration corridor of Danube fish species. The impact of the dams has resulted in sharp declines of the formerly six native Danube sturgeon species in recent decades.

In a European context the Iron Gate Dams are a top priority for river continuity restoration. Restoring fish passage at the Iron Gate Dams has been classified as of “utmost priority” in the Danube River Basin Management Plans. It is a central concern in the wider endeavor of preserving biodi­ver­sity and the ecological viability of the entire Danube River.

The Iron Gates

Previous studies have concluded that fish migration restoration appears technically feasible at the Iron Gate Dams I & II. In this second project stage “WePass2” options to establish up- and downstream fish passage at both Iron Gate Dams were inves­ti­gated and a preliminary design of the identified preferred fish pass(es) comprising all technical elements was elaborated including a first cost estimate. This will allow funding decisions to be made, and imple­men­ta­tion of fish pass facilities at the Iron Gate in a subsequent stage.

CDM Smith was contracted by the European Commission Directorate Environment to carry out the feasibility study including:

  • an alter­na­tives study to identify feasible options for upstream fish passage, and fish protection and downstream passage restoration;
  • fish movement monitoring at the dams and in the reservoir using 3D acoustic telemetry; and
  • preliminary design of the preferred option(s) including 2D and 3D hydro-numerical modelling.

The above activities were executed by an inter­na­tional team of multi-disci­pli­nary experts and are based on initial works carried out in the first WePass project stage.

WePass2 pursues the targets of pertinent policies, regulations, and frameworks. Besides the EC Water Framework Directive, it will also contribute to achieving the objectives of the EU Biodi­ver­sity Strategy for 2030, the EC Habitats Directive, the Bern and Bonn Conventions (incl. Pan-European Action Plan For Sturgeons) and the ICPDR Sturgeon Strategy.

Discover the study's key findings here  and learn more about the technical feasibility of restoring upstream and downstream fish passage at the Iron Gate dams.

Project Contact

Have questions about our project or services? Our expert is happy to help.

Person in a dark suit with a blue tie standing against a brick wall backdrop.

Marq Redeker

Senior Business Development Manager

Expert in water management and hydraulic engineering, with experience in flood protection, river engineering and industrial water management.

Project Partners

A row of logos representing various organizations, displayed on a white background.

Related Projects

Want to learn more about what we do? Browse our projects to discover our expertise in action.

Construction site with cranes, vehicles, and equipment, surrounded by buildings and roads.
Japan

Environmental Site Investigations and Remediation for Bosch Sites in Japan

Waterfront view of historic and modern buildings along a sunny coast, with calm water in the foreground and hills in the background.
Turkey

Improving the Turkish Water Infrastructure

Aerial view of an illuminated construction site at night, showing a large excavation area with structural supports, machinery, and surrounding roads.
Frankfurt, Deutschland

Extension of U5 Subway Line in Frankfurt – Connection to a New District