Rethinking Superfund remediation 

CDM Smith supported USEPA in meeting ambitious cleanup goals at the Well 12A Superfund site, an area contaminated with DNAPLs that had baffled scientists and engineers for decades. 

Client

USEPA

Location

Tacoma, Washington

Practices

Connect with an expert

Person with long hair in a black and white patterned shirt, standing in an office setting.
Tamzen Macbeth PhD, PE, BCEE
Environmental Engineer

Tackling one of the most difficult remediation projects in the United States 

Nearly a half-century of industrial manufacturing and waste oil recycling left behind harmful chemicals in the groundwater near Commencement Bay and the Port of Tacoma. When traces of TCE were found in a water well, it joined the list of Superfund sites, and years of remediation efforts followed with mixed results. Conventional methods successfully removed some of the chemicals, but the process was slow. USEPA and CDM Smith introduced a new strategy with three additional treatment technologies, made possible by CDM Smith's research efforts. They paired the new aggressive triple-treatment approach with a contaminant mass-discharge reduction goal, using a mix of integrated technologies to maximize synergy and overall treatment performance. 

$1 million in cost savings  

Our team was able to narrow the target area, allowing for more localized treatment and saving significant expense. 

A 97% reduction in TCE mass discharge 

Even with an ambitious goal of 90% reduction, the team exceeded it by an incredible margin. 

3D modeling of the contaminated site 

Modeling pinpointed a discrete zone of DNAPL-impacted aquifer responsible for over 96% of contaminant discharge. 

Returning the site to the state of Washington 

Bringing the site in line with EPA goals cleared the path to turnover of the site. 

The Well 12A project team achieved the record of decision goals and made more progress in reducing the contaminant impacts to the drinking water aquifer than the previous 30 years of treatment.

This project represents a significant investment in the restoration of the aquifer to its beneficial use as a drinking water source for the City of Tacoma. Post-remediation sampling and evaluations have demon­strated that the project lowered contaminant mass discharge well below acceptable levels and that residual contaminants will attenuate to below MCLs prior to reaching Well 12A. Additionally, the project has set a precedent for the continued use of mass discharge as a measure of success. Incorporating mass discharge into a project record of decision can lead to more efficient treatment combinations and ultimately a more cost-effective and streamlined remediation process. 

Deployment and results

Curious to learn more?

Connect with an expert to find out how we delivered this project.

Person with long hair in a black and white patterned shirt, standing in an office setting.

Tamzen Macbeth

Environmental Engineer

Tamzen is a remediation expert specializing in innovative, cost-effective strategies for cleaning up hazardous waste sites, from design to implementation.

See more of our work in remediation


Aerial view of Cramer Hill Waterfront Park, Camden, showing waterways and greenery, with city skyline in the background.
Camden, New Jersey

Revitalizing Camden’s waterfront

aerial view of playa vista
Los Angeles, California

Remediation and renewal for "Silicon Beach"

People collecting water samples in Kalamazoo River, wearing waders, with a boat holding equipment in shallow water.
Lansing, Michigan

Restoring the Kalamazoo River watershed