Skip to Main Content
CDM Smith logo
CDM Smith Site Logo
Project background not configured

Practices

One WaterWater Resource Infrastructure and ResiliencyWater Reuse and Industrial Treatment

Markets

Local Government

Priorities

Water Reuse and Desalination

San Diego charts a long-term roadmap for reliable, climate-ready water resources 

San Diego relies heavily on imported water that is vulnerable to drought, climate change and environmental regulations. With demand expected to rise as the city grows, the San Diego Public Utilities Department (SDPUD) partnered with CDM Smith to strengthen reliability and local resilience. 

Assessing supply and demand risks 

Climate impacts, growth projections and system vulnerability evaluations helped predict shifts in long-term supply

Comparing diverse water solutions 

Dozens of potential water supply options were reviewed to identify strategies that balance cost, reliability and feasibility. 

Building stakeholder consensus 

A stakeholder advisory committee representing various community groups shaped objectives and ensured broad public alignment. 

Gaining community confidence 

A 1-mgd demonstration project was built to support community education and strengthen confidence in future programs. 

The resulting long-range plan provides a flexible roadmap that SDPUD will update every 5 to 10 years as conditions evolve. It positions the city to expand conservation, boost local groundwater use and adopt purified wastewater for indirect potable reuse. “Planning for climate uncertainty is an important part of remaining a resilient city,” says deputy director Marsi Steirer, underscoring the city’s commitment to reliable, cost-effective and environmentally responsible water service

Curious to learn more?

Connect with an expert to find out how we delivered this project.

Rodrigo_Dan_2021.jpg

Dan Rodrigo

Environmental Planner

Dan is a leading expert in integrated water resources planning, decision science and climate risk and resiliency, with a gift for building stakeholder consensus.

Practices

One WaterWater Resource Infrastructure and ResiliencyWater Reuse and Industrial Treatment

Markets

Local Government

Priorities

Water Reuse and Desalination

Other projects in this region

View All Projects
Industrial water treatment facility with frothy liquid and clear blue sky.
Caldwell, Idaho

Meeting zero liquid discharge goals for a potato processing powerhouse

View Project
View of airport construction area with fuel tanks in the foreground and terminal structures under development in the background.
Los Angeles, California

Environmental approvals for LAX improvements 

View Project
Aerial view of a long floating bridge spanning a wide body of water with urban areas on both sides.
Seattle, Washington

Tolling keeps Washington bridge afloat 

View Project
CDM Smith logo

Let’s Build Something Together

Have a project in mind or want to stay in the loop? Reach out to our team or subscribe to get the latest updates from our work.
Contact UsSubscribe

World Headquarters

75 State Street
Suite 701
Boston, MA 02109 USA
What We Do
  • Markets
  • Practices
  • Priorities
  • Projects
  • Innovation and Technologies
Who We Are
  • About Us
  • Careers
  • Cultural Threads Blog
  • Find Us
  • News
Resources
  • Insights
  • Subcontracting
  • Webinars
  • Legal & Terms of Use
  • Privacy Statement
  • Accommodation Request
  • California Privacy Rights
  • Contract Vehicles
CDM Smith™ | CDM™ | WILBUR SMITH™
© 2026 CDM Smith. All rights reserved.