CDM Smith provided construction supervision, contract administration and commercial management services for the Construction of Flow Diversion in Al Tarfa, Legtaifiya and Jelaiah (C830). Working on behalf of the Public Works Authority (Ashghal), the team oversaw the delivery of gravity sewer infrastructure, microtunneling works, deep manholes and pumping station decommissioning activities. Through proactive construction management, technical oversight, and stakeholder coordination, CDM Smith helped advance a strategic wastewater program that improves operational efficiency and long-term network resilience. This also supported the long term localized foul issue, eliminating the localized pump stations and conveying foul sever by gravity directly to Sewerage Treatment Plant. 

Modernizing Wastewater Infrastructure

The project supports Doha’s long-term wastewater strategy by replacing localized pumping stations with a more reliable and sustainable gravity sewer network. 

Complex Trenchless Construction

More than four kilometers of sewer infrastructure were delivered using non-disruptive microtunneling methods, minimizing impacts on surrounding communities and road networks. 

Construction and Commercial Oversight

CDM Smith managed construction supervision, contract administration, quality assurance and commercial controls to support successful project delivery. 

Innovation Through Constructability

The team supported innovative precast manhole solutions that accelerated construction activities while maintaining structural performance and project requirements. 

The Public Works Authority (Ashghal) appointed CDM Smith to provide construction supervision and post-contract professional consultancy services for the Construction of Flow Diversion in Al Tarfa, Legtaifiya and Jelaiah (C830), a critical component of Doha’s wastewater infrastructure expansion program. The project supports a broader strategy to modernize wastewater collection systems across northern Doha by diverting flows from existing pumping stations into a gravity-based sewer network connected to the Doha North Sewage Treatment Works. Once complete, the scheme will enable the decommissioning of five existing pumping stations, reducing operational and maintenance requirements while improving long-term system reliability.

CDM Smith’s services included project administration, construction supervision, stakeholder management, commercial management, quality assurance and health and safety oversight. The project involved construction of approximately 5.7 kilometers of gravity sewer pipelines using both open-cut and trenchless installation methods, 64 deep manholes, foul sewer rising mains, CCTV inspections and pumping station decommissioning works. The team also coordinated utility interfaces, traffic management approvals and environmental compliance activities within a dense urban environment that included residential communities, schools, mosques and major transportation corridors. Through proactive technical review and construction management, CDM Smith helped implement innovative solutions, including the use of precast manholes to accelerate delivery and specialized microtunneling approaches (between 22 to 26 m deep) to address challenging ground conditions. The completed project strengthens Doha’s wastewater network while supporting future population growth and sustainable urban development. 

Curious to learn more?

Connect with an expert to find out how we delivered this project. 

Person in a gray suit and pink turban, standing in a modern office.

Ravinder Singh Sason, CPEng, PMP

Senior Resident Engineer

Ravinder is a Chartered Engineer and a project management professional with 35+ years of experience in delivering complex civil, structural and infrastructure projects .

Practices

Water ConveyanceSewage, Drainage, and IrrigationWater ReclamationGeotechnical & Tunnels

Markets

Local GovernmentGovernment Agencies

See more projects in this region 

Selected projects illustrating our technical and delivery experience.

View More Projects
Rusty pipe leading into ocean at sunrise, with waves crashing.
Doha, Qatar

Musaimeer Pumping Station and Outfall Design

View Project
Dimly lit sewer tunnel with two light bulbs illuminating the curved, smooth walls.
Qatar

Qatar South Sewer Strategic Tunnels Design 

View Project
Large industrial tanks and pipes in a desert setting under a clear blue sky.
Kuwait

Sulaibiya Wastewater Treatment and Reclamation Facility 

View Project
Aerial view of circular sewage treatment tanks with catwalks at a facility.
Qatar

Doha North Sewage Treatment Project 

View Project
Droplet of water falling into a calm water surface, creating ripples.
Qatar

Design Engineering Consultant for hydraulic modeling and engineering

View Project
A construction site featuring large tunnel boring machines and a yellow overhead crane under a blue sky.
Doha, Qatar

Abu Hamour Drainage Tunnel Phase 1 

View Project
CDM Smith logo

Let's Build Something Together

Have a project in mind or want to stay in the loop? Reach out to our team or subscribe to get the latest updates from our work.
Contact Us
World Headquarters
75 State Street
Suite 701
Boston, MA 02109 USA
What We Do
  • Markets
  • Practices
  • Projects
Who We Are
  • About Us
  • Careers
  • Find Us
  • Legal & Terms of Use
  • Privacy Statement
CDM Smith™ | CDM™ | WILBUR SMITH™
© 2026 CDM Smith. All rights reserved.