Construction supervision for a strategic TSE pumping station and long-distance transmission system

CDM Smith provided construction supervision and contract administration for the C762 D Line TSE Pumping Station and Transmission Main project in Doha, Qatar. The team delivered a large-scale wastewater reuse system, including a high-capacity pumping station and extensive transmission pipeline. Services included review and approval of construction shop drawings, materials/equipment and method statements, site supervision, commercial, QA/QC, and HSE management. Through structured project controls, progress monitoring and coordination across stakeholders, CDM Smith ensured quality delivery, schedule adherence, and compliance with technical and safety standards. 

Delivering a High-Capacity TSE System

 The project includes construction of a major TSE pumping station with a discharge capacity of 120,000 m³/day and total dynamic head of about 15 bars, supporting the conveyance of treated sewage effluent for reuse and irrigation across key fodder farmlands.

Extensive Transmission Network Across Doha

Works involved approximately 65 km of DN1200 transmission main, connecting the Doha South Sewage Treatment Works to Al Ghadeer & Hassad Farms and onward to a seasonal storage lagoon, forming a critical component of the water reuse network. 

Complex Installation and Microtunneling Works

The project required microtunneling of approximately 4 km at major crossings and intersections, enabling safe and efficient installation of pipelines within constrained urban and utility corridors. 

Integrated Mechanical and Electrical Systems

Scope included installation of switchgear, transformers, HVAC, surge protection vessels, firefighting systems, SCADA and low-current systems, ensuring full operational capability of the pumping station and supporting infrastructure. 

The C762 D Line TSE Pumping Station and Transmission Main project is a key infrastructure development in Doha enabling sustainable water reuse for irrigation systems and sand washing supply. Commissioned by the Public Works Authority (Ashghal), the project includes construction of a high-capacity pumping station with a discharge capacity of 120,000 m³/day at 15 bars head and approximately 65 km of 1200 mm diameter transmission pipelines extending from the Doha South Sewage Treatment Works to Al Ghadeer & Hassad Farm, sand washing plants and a seasonal storage lagoon. The work also involved microtunneling at critical crossings and installation of mechanical, electrical, and utility systems to support operations. CDM Smith provided construction supervision, contract administration and project controls, overseeing site activities, reviewing materials and method statements, and ensuring compliance with quality, health, safety and environmental standards. Through effective coordination and performance monitoring, CDM Smith supported the successful delivery of a complex system that enhances water reuse and long-term infrastructure resilience in Qatar. 

Curious to learn more?

Connect with an expert to find out how we delivered this project. 

Person in a business suit and tie in a modern office setting.

Adjutor Fabro, CEng, FICE

Vice President & Senior Project Manager

Adjutor is a water infrastructure expert with 32+ years of experience in delivering major water, wastewater and stormwater programs across GCC with strong design and project management leadership.

Practices

Construction SupervisionWater ConveyanceSewage, Drainage, and IrrigationWater Reuse

Markets

Local GovernmentGovernment AgenciesUtilities

See more projects in this region  

Selected projects illustrating our technical and delivery experience.

View More Projects
Dimly lit sewer tunnel with two light bulbs illuminating the curved, smooth walls.
Qatar

Qatar South Sewer Strategic Tunnels Design 

View Project
Aerial view of circular sewage treatment tanks with catwalks at a facility.
Qatar

Doha North Sewage Treatment Project 

View Project
Workers in a construction site installing large cylindrical concrete structures in a deep excavated area.
Doha, Qatar

Doha North Flow Diversion Program

View Project
CDM Smith logo

Let's Build Something Together

Have a project in mind or want to stay in the loop? Reach out to our team or subscribe to get the latest updates from our work.
Contact Us
World Headquarters
75 State Street
Suite 701
Boston, MA 02109 USA
What We Do
  • Markets
  • Practices
  • Projects
Who We Are
  • About Us
  • Careers
  • Find Us
  • Legal & Terms of Use
  • Privacy Statement
CDM Smith™ | CDM™ | WILBUR SMITH™
© 2026 CDM Smith. All rights reserved.